1. >
  2. >
Share |

Construction of the Magdalena Mixed Barge 

Touax built a mixed barge on the Magdalena River.

It is a barge with a liquid tank (1500 m3) in the bottom of the barge and bulk (1000 T) or container 20' (32) on top.